top of page

Time and Effort

Week
Deven
Jon
Group
7/21/2024
Review project alignment with anticipated customer needs (2 Hrs)
Update website (4 Hrs)
Review and finalize all project documents (2.5 Hrs)
7/20/2024
Revise report to include weight and physical aspects (2 Hrs)
Proofread and finalize report (2 Hrs)
Revise engineering specifications, requirements, success criteria (4 Hrs)
7/19/2024
Update progress log as discussed with professor (1 Hr)
Progress Log, Timeline & Schedule (1 Hr)
Research relays and necessary sensors (2.5 Hrs)
7/18/2024
Research soil and seeds for testing (3.5 Hrs)
Continue with motor controller research (5 Hrs)
Research AC to DC supply and motor controllers (2 Hrs)
7/17/2024
Identify missing items in proposed budget (1 Hr)
Progress Log (3 Hrs)
Identify & research DC motors for linear axis movement (2 Hrs)
7/16/2024
Finalize report, begin preliminary presentation work (4 Hrs)
Continue researching the best motor for the design (2 Hrs)
Discuss ideal customer profile, update based on needs (1.5 Hrs)
7/15/2024
Update Engineering Requirements & Specifications (2 Hrs)
Motor/Motor Mount/Motor Driver Research (1.5 Hrs)
Redesign circuit for simplicity, decide on 12V DC adapter (1 Hr)
Week 10
7/14/2024
Updated engineering requirements and specifications. (4 Hrs)
Researched the need for two pumps: one for fresh water and one for fertilizer. (2.5 Hrs)
Discussed and emphasized the completion of the rough draft for the report.(2 Hrs)
7/13/2024
Worked on the progress log updates for the website. (1 Hrs)
Researched and identified appropriate pumps, came across peristaltic pumps, and gathered information on them. (4 Hrs)
Met to assign responsibilities for the week. (2 Hrs)
7/12/2024
Continued progress on the proposed budget and ensured all specifications were updated. (3 Hrs)
Researched 12V DC peristaltic pumps and evaluated their suitability for the project. (2.5 Hrs)
Emphasized the importance of thorough research on components and their applications. (2.5 Hrs)
7/11/2024
Updated the report with new findings and refined the engineering specifications. (4 Hrs)
Found a micro brushless pump that meets the flow rate of 63 GPH and evaluated its suitability. (1.5 Hrs)
Reviewed the need for a pump that meets design requirements and prioritized updating the report and website. (2.5 Hrs)
7/10/2024
Reviewed the progress log and proposed budget for accuracy and completeness. (1.5 Hrs)
Worked on understanding the functionality of relays and MOSFETs for interfacing the 12V DC mini pump with Arduino. (4.5 Hrs)
Discussed and evaluated the engineering requirements and specifications in the weekly meeting. (2 Hrs)
7/9/2024
Ensured all updates were reflected in the report, website, and other project documents. (2 Hrs)
Compared the pros and cons of using relays versus MOSFETs for controlling the pump, and gathered information from various sources. (3.5 Hrs)
Updated the success criteria, engineering requirements, and specifications based on new findings. (2 Hrs)
7/8/2024
Finalized updates to the engineering requirements and specifications, and documented lessons learned. (4.5 Hrs)
Updated the website and report with new information on the pumps and their specifications. (1 Hr)
Collaborated with Jon to discuss the potential switch of the pump motor and its impact on the project. (2 Hrs)
Week 9
7/7/2024
Worked on engineering requirements & specifications. (5.5 Hrs)
Began working on the 3D rendering in Fusion360. (6 Hrs)
Discussed aspects of the 3D rendering, website updates, engineering requirements, Timeline & Schedule, success criteria, and time & effort table. (2 Hrs)
7/6/2024
Updated the time & effort table. (4 Hrs)
Researched the placement and movement of the NPK sensor relative to the grow trays. (2.5 Hrs)
Split work assignments: Deven to work on engineering requirements, time & effort table, and website updates; Jon to work on 3D rendering, success criteria, and website updates. (1.5 Hrs)
7/5/2024
Made updates to the website. (1.5 Hrs)
Researched and added components like the x-axis rod and twin jug holders to the 3D rendering. (2.5 Hrs)
Conducted a meeting with the professor for detailed discussion on design dimensions and components. (2.5 Hrs)
7/4/2024
Ensured all engineering specifications were up-to-date on the website. (2.5 Hrs)
Worked on updating the homepage with the latest rendering, overall dimensions, and main menu design adjustments. (2.5 Hrs)
Assigned responsibilities for the week. (2 Hrs)
7/3/2024
Updated the progress log on the website. (1 Hr)
Revised the success criteria to include trials and percentage of success. (4 Hrs)
Continued working on the report, splitting chapters and outlining sections. (2 Hrs)
7/2/2024
Worked on the proposed budget. (2 Hrs)
Updated the power budget and timeline & schedule on the website. (4 Hrs)
Finalized updates to the power budget columns and timeline percentages. (2 Hrs)
7/1/2024
Began writing the abstract and acknowledgments for the report. (2.5 Hrs)
Began writing the introduction and subsequent sections for the report. (5 Hrs)
Met to brainstorm and outline the report, ensuring all updates are according to guidelines. (1.5 Hrs)
Week 8
6/30/2024
Begin drafting engineering requirements & specifications (3 Hrs)
Start researching and working on 3D rendering (Fusion360) (6.5 Hrs)
Team meeting to assign tasks and discuss weekly goals (0.5 Hrs)
6/29/2024
Work on time & effort table (1 Hrs)
Continue 3D rendering and research on NPK sensor placement (2 Hrs)
Review design dimensions and component placements (2 Hrs)
6/28/2024
Update website with homepage changes (0.5 Hr)
Apply cylindrical holders to rear design and update rendering (4.5 Hrs)
Discuss progress on rendering and website updates (1.5 Hrs)
6/27/2024
Revise engineering requirements and specifications (4 Hrs)
Finalize rendering and start working on success criteria (4.5 Hrs)
Group discussion on success criteria and testing plans (3 Hrs)
6/26/2024
Begin drafting the power budget (5 Hrs)
Update website with new success criteria and power budget (4.5 Hrs)
Team meeting to review website and success criteria (2 Hrs)
6/25/2024
Work on preliminary formatting of the report (5.5 Hrs)
Continue updates to success criteria and power budget (2 Hrs)
Discuss preliminary formatting and report sections (2 Hrs)
6/24/2024
Update report sections (Abstract and Acknowledgments) (4 Hrs)
Update website and finalize report sections (3.5 Hrs)
Finalize report outline and schedule updates (2 Hrs)
Week 7
6/23/2024
Update engineering requirements & specifications (4 Hrs)
Continue formatting and styling the website (3 Hrs)
Team meeting to choose project name and assign responsibilities (2 Hrs)
6/22/2024
Refine proposed budget and engineering specifications (3 Hrs)
Revise homepage for clarity and update progress log (2 Hrs)
Discuss project name options and finalize "NurtureNest" (0.5 Hrs)
6/21/2024
Address missing items in proposed budget, such as soil and seeds (4 Hrs)
Update success criteria with additional components and clarify (2.5 Hrs)
Review progress log and timeline updates (1.5 Hrs)
6/20/2024
Update the profile of ideal customer and align project (1 Hrs)
Design opening for water tank accessibility and update electronics section (3 Hrs)
Discuss and implement changes to success criteria based on professor’s feedback (1.5 Hrs)
6/19/2024
Refine and update engineering design requirements (4.5 Hrs)
Finalize success criteria with clear goals, trials, and success rates (2.5 Hrs)
Team meeting to review and discuss website updates and success criteria revisions (1.5 Hrs)
6/18/2024
Begin preliminary formatting of the report (5.5 Hrs)
Continue revisions and updates to website and success criteria (2 Hrs)
Finalize formatting and styling for report sections (2 Hrs)
6/17/2024
Update report sections as needed (abstract, background) (3 Hrs)
Continue updates to website and progress log (2 Hrs)
Review and finalize report formatting and updates (2 Hrs)
Week 6
6/16/2024
Update engineering requirements and specifications based on professor's feedback (2 Hrs)
Continue rendering and start creating power budget (3.5 Hrs)
Team meeting to discuss customer profile and finalize dimensions (2 Hrs)
6/15/2024
Finalize profile of ideal customer and update proposed budget (2.5 Hrs)
Construct and detail power budget; include voltage, current, and power calculations (3.5 Hrs)
Discuss ideal customer attributes and requirements (2 .5Hrs)
6/14/2024
Discuss missing items in proposed budget (soil, seeds) and target plants (4 Hrs)
Upload updated 3D rendering images to the homepage (4 Hrs)
Review and agree on rendering updates and focus on household design (2 Hrs)
6/13/2024
Update engineering requirements with physical aspects and functionality (3 Hrs)
Continue website updates with new rendering angles and power budget details (2 Hrs)
Team meeting to review progress on rendering and power budget (3 Hrs)
6/12/2024
Refine proposed budget to include all components and functionalities (2.5 Hrs)
Add Grow trays, water pump, Arduino to 3D rendering (1.5 Hrs)
Discuss and finalize project’s dimensions and power requirements (1.5 Hrs)
6/11/2024
Begin preliminary formatting of the report with updated information (3.5 Hrs)
Finalize power budget table and ensure safety of component values (2 Hrs)
Discuss lessons learned and future improvements for design (1 Hrs)
6/10/2024
Review and finalize engineering design requirements and specifications (1.5Hrs)
Continue to update website and power budget sections (1.5 Hrs)
Finalize group report and updates based on recent discussions (2 Hrs)
Week 5
6/9/2024
Update engineering requirements and specifications (2 Hrs)
Create timeline & schedule, weekly meetings page (2 Hrs)
Team meeting to assign responsibilities and discuss project goals (2 Hrs)
6/8/2024
Finalize profile of ideal customer and update proposed budget (3.5 Hrs)
Design progress log with weekly pages (4.5 Hrs)
Discuss and finalize project name and title consolidation (2.5 Hrs)
6/7/2024
Update the final block diagram with latest changes (2.5 Hrs)
Develop success criteria based on Professor Notash’s feedback (2.5 Hrs)
Review updates to engineering requirements and website changes (2 Hrs)
6/6/2024
Add missing items to the proposed budget (soil, seeds) (4 Hrs)
Complete timeline and schedule; integrate feedback (4 Hrs)
Discuss updates to the success criteria and module testing plans (2 Hrs)
6/5/2024
Refine engineering requirements and finalize the budget (2.5 Hrs)
Update and format success criteria table (4.5 Hrs)
Review and finalize project goals, title, and domain name (1 Hr)
6/4/2024
Begin preliminary formatting of the report (4 Hrs)
Finalize and upload website updates, including new renderings (2 Hrs)
Team meeting to review progress and ensure alignment with goals (1 Hr)
6/3/2024
Review and update report sections based on recent changes (1.5 Hrs)
Finalize weekly minutes and progress log (3 Hrs)
Discuss lessons learned and plan for next steps (2 Hrs)
Week 4
6/2/2024
Work on engineering requirements and specifications (2 Hrs)
Start 3D rendering in Fusion360, initial sketches (5.5 Hrs)
Team meeting to finalize project idea and split responsibilities (2 Hrs)
6/1/2024
Prepare weekly presentation slides and meeting minutes (4.5 Hrs)
Continue 3D rendering, focus on design features (4 Hrs)
Discuss and decide on design features and requirements (2.5 Hrs)
5/31/2024
Update time and effort table based on progress (1 Hrs)
Begin preliminary updates to the website homepage (2 Hrs)
Review progress and initial drafts of 3D rendering and website (1 Hr)
5/30/2024
Refine engineering requirements based on feedback (2 Hrs)
Add temperature control feature and ventilation to rendering (6 Hrs)
Meet to brainstorm and finalize design features (3 Hrs)
5/29/2024
Continue working on engineering specifications (2.5 Hrs)
Add fertilizer and water jug holders to 3D rendering (4 Hrs)
Check alignment between engineering specs and design (2 Hrs)
5/28/2024
Review and update engineering requirements for accuracy (2.5 Hrs)
Update website with new design images and team contact info (2 Hrs)
Finalize and agree on design and website updates (2 Hrs)
5/27/2024
Compile progress log and prepare for next week's presentation (2 Hrs)
Review 3D rendering progress and make adjustments as needed (2 Hrs)
Discuss lessons learned and plan for future tasks (2 Hrs)
Week 3
5/26/2024
Create S.M.A.R.T. slides for Seedling Grow Center (2 Hrs)
Create S.M.A.R.T. slides for Sanitation Bot (2.5 Hrs)
Team meeting to discuss Professor's feedback and split tasks (0.5 Hrs)
5/25/2024
Refine S.M.A.R.T. slides for Seedling Grow Center (3.5 Hrs)
Create S.M.A.R.T. slides for Item Locator Bot (2.5 Hrs)
Review and finalize S.M.A.R.T. criteria for each proposal (2 Hrs)
5/24/2024
Update and review engineering requirements based on feedback (3.5 Hrs)
Continue work on 3D rendering and incorporate feedback (3.5 Hrs)
Plan next steps for project development based on S.M.A.R.T. feedback (1.5 Hrs)
5/23/2024
Prepare and organize S.M.A.R.T. slides for team review (2.5 Hrs)
Complete 3D rendering updates, focusing on temperature control and ventilation (4.5 Hrs)
Discuss S.M.A.R.T. implementation and design improvements (1.5 Hrs)
5/22/2024
Work on integrating S.M.A.R.T. criteria into project proposals (2.5 Hrs)
Preliminary updates to the website homepage (2 Hrs)
Meet to ensure alignment between S.M.A.R.T. goals and project requirements (1.5 Hrs)
5/21/2024
Continue refining the Seedling Grow Center proposal with S.M.A.R.T. feedback (2 Hrs)
Address any issues in the 3D rendering and finalize adjustments (2.5 Hrs)
Final review of S.M.A.R.T. slides and incorporation of feedback (2 Hrs)
5/20/2024
Compile and finalize S.M.A.R.T. slides for Seedling Grow Center (2.5 Hrs)
Review website updates and finalize any changes (3.5 Hrs)
Reflect on the week's progress and plan for the following week (2 Hrs)
Week 2
5/19/2024
Revise proposal ideas based on Professor's feedback ( 1 Hr)
Research components for Sanitation Bot (2 Hrs)
Team meeting to assign weekly tasks (2 Hrs)
5/18/2024
Combine at-home soil test and automatic grow box functionalities into one project (2 Hrs)
Begin creating presentation slides for Sanitation Bot and Item Locator Bot (1.5 Hrs)
Brainstorm additional proposal ideas (2 Hrs)
5/17/2024
Research marketability of the combined project and compare with existing products (2.5 Hrs)
Continue research on Sanitation Bot components and design (2.5 Hrs)
Discuss and finalize proposal ideas (2 Hrs)
5/16/2024
Finalize proposal ideas and presentation slides (3.5 Hrs)
Work on detailing the design and specifications of the Sanitation Bot (2.5 Hrs)
Review and refine presentation slides (2.5 Hrs)
5/15/2024
Prepare and organize the presentation slides for the new project (2 Hrs)
Research and develop new proposal ideas (2.5 Hrs)
Assign tasks for upcoming week (1.5 Hrs)
5/14/2024
Update and integrate new project details into proposal (2 Hrs)
Develop detailed specs for Sanitation Bot and Item Locator Bot (4 Hrs)
Review progress on proposal ideas (3 Hrs)
5/13/2024
Continue researching market potential and finalize proposal documents (4 Hrs)
Finalize presentation slides and prepare for review (4 Hrs)
Reflect on the week's work and plan next steps (1.5 Hrs)
Week 1
5/12/2024
Brainstorm additional proposal ideas (4 Hrs)
Research wearable elderly fall detection devices (4.5 Hrs)
Team meeting to assign weekly tasks (2 Hrs)
5/11/2024
Work on presentation slides for new proposals (3.5 Hrs)
Develop details for Smart Fire Sprinter design (5 Hrs)
Discuss and finalize proposal ideas (0.5 Hrs)
5/10/2024
Continue researching market potential for proposals (4.5 Hrs)
Begin comparing components for Smart Fire Sprinter and wearable devices (3.5 Hrs)
Collaborate on presentation content (1.5 Hrs)

© 2035 by Sphere Constructions. Powered and secured by Wix

  • Facebook
  • Linkedin
bottom of page